Madhya Pradesh and Maharashtra Sign MoU for Tapti Basin Mega Recharge Project
Aspect | Details |
---|---|
Project Name | Tapti Basin Mega Recharge Project |
States Involved | Madhya Pradesh and Maharashtra |
Purpose | Optimal utilization of river water resources for irrigation and drinking water supply. |
Project Scale | World's largest groundwater recharge scheme |
Tributaries Involved | Three tributaries of the Tapti River originating from Multai, Madhya Pradesh. |
Water Allocation | Total water: 31.13 TMC. Madhya Pradesh: 11.76 TMC, Maharashtra: 19.36 TMC. |
Infrastructure | Diversion weir on the Madhya Pradesh-Maharashtra border, right and left bank canals. |
Land Use | 3,362 hectares of land in Madhya Pradesh. No displacement or rehabilitation needed. |
Beneficiary Districts | MP: Burhanpur, Khandwa. Maharashtra: Akola, Amravati, Buldhana. |
Tapti River Origin | Satpura mountain range in Betul district, Madhya Pradesh. |
Tapti River Basin | Madhya Pradesh, Gujarat, and Maharashtra. |
Major Tributaries | Purna, Girna, Panjara (flow from Maharashtra). |
Ukai Dam | Major hydroelectric project on the Tapi River providing water and power to surrounding areas. |